29 September 2005
 
Update on Main Street Repaving
    Although I couldn't resist hassling him a bit about the mess he's made of Main Street, I had a good talk this a.m. with Walpole Road Agent Jim Terrell on the project.

    Jim said that they were doing rough grading today, letting it settle down (and be driven on) until next Tuesday or Wednesday, and then doing the fine grading.  Thereafter, weather permitting, he hopes that they can do the paving next Thursday or Friday.  Then, when the paving is finished, the granite curbs will be installed from the Post Office to Middle Street on the west side and, on the east side, from the library southward.

    It should be pretty nice when finished!  CCB
Posted by Chuck Bingaman at 11:09 AM | Comments (1)