17 January 2007
 
Bensonwood Bridge Proposal Open Meeting Tonight
Post a comment (login required)
Ed. Note: Tedd Benson and his design team will do a public showing tonight at Town Hall at 7:30 p.m. of the hybrid timber, steel and concrete bridge design they intend to propose to the NHDOT next week. The public is invited.  The official NHDOT hearing on the topic--to be followed shortly thereafter by a decision--is set for NEXT Wednesday, the 24th at 7:30 p.m.  CCB
Posted by Chuck Bingaman at 11:33 AM | Comments (1)
 
Subscription Options

You are not logged in, so your subscription status for this entry is unknown. You can login or register here.

Re: Bensonwood Bridge Proposal Open Meeting Tonight
Ted Bensons team did an excellent job of describing the 123 bridge proposal on Thursday night .This 21st century design captures 18th century history , melds the farsighted thinking combination of wood, cement and steel and will be way better to look at than a drab cement / steel span. And it has been proposed by a local business group that knows how to bring together the use of a renewable resource product with non renewable stuff.

Ted and his team are to be congratulated !!! What has been proposed does not get any better. On with it's construction.

Merv Stevens

Posted by betmerv on January 18, 2007 at 4:12 PM

Post a comment (login required)