14 November 2006
 
Walpole Hearing on Rt. 123 Bridge Design
Post a comment (login required)

Ed. Note:  Several plans are being considered for the replacement of the century-old double arched stone bridge that was knocked down by the flood on the Cold River 13 months ago.  This hearing announced below by NHDOT will allow citizen input on the preferred design of the new span.  To date the question has been whether to build a single span or a dual span.  The dual span would cost more and take a little more time ot build.  Recently a local group suggested a wooden covered bridge.  Orginally  the goal was to build it in 2007; now it's looking more like 2008.  Come to this hearing to get the latest info and to speak your piece if you have  an opinion or a suggestion.  CCB

The New Hampshire Department of Transportation announces a Public Informational Meeting will be held Tuesday, December 5, 2006 in Walpole to discuss options for replacing the bridge that carried NH Route 123 over the Cold River.

The purpose of this meeting is to present citizens and public officials with information regarding the proposed bridge options and to solicit input in order to ensure that project decisions meet public transportation needs, community goals, and protect and enhance the environment.

        The December 5 public meeting will be held at the Walpole Town Hall, 34 Elm Street in Walpole, New Hampshire, beginning at 7:00 pm.
Posted by Chuck Bingaman at 12:47 PM | Comments (0)
 
Subscription Options

You are not logged in, so your subscription status for this entry is unknown. You can login or register here.

No comments found.

Post a comment (login required)